UNIQUE LIVING IN A TOWNSHIP OF YOUR OWN

The first mega residential project in Odisha’s Jaipur Road

  • S+10
    Storied
  • 494
    Apartments
  • First gated community
    of 4.97 acre at Jajpur Road
  • 1, 2 & 3
    BHK
  • ORERA REG
    MP/13/2018/00049

location

  • SCHOOLS NEARBY
    • Mount Litera Zee School 3.7 kms
    • St Xavier’s High School 6.9 kms
    • Loyola School 2.6 kms
    • St. Mary’s School 7.9 kms
  • HOSPITALS NEARBY
    • CHC Hospital 2 kms
    • Jajpur Hospital 9.5 kms
  • FOR LEISURE
    • Hotel Brahmani 8 kms
    • Hotel Deo Residency and Resorts 9 kms
    • Hotel Royal Kalinga 8.7 kms
    • Hotel Natraj Royal 8 kms
  • EASY COMMUTE
    • Jajpur Railway Station 9 kms
    • Chorda Square 7 kms

LIFESTYLE

A/V room

Gymnasium + Yoga room

Indoor games room

Landscaped Garden

Multipurpose hall with pantry

Swimming pool

specifications

Walls

  • FinishingWall putty with primer finish

Floors

  • Living, dining and bed roomVitrified tiles on floor

Windows & Doors

  • DoorWooden door frame
  • DoorPainted flush doors
  • DoorOutside polished & inside painted main door
  • Window Anodized aluminium sliding window with clear
    toughened glass

Kitchen

  • FloorVitrified tiles on floor
  • Counter topBlack granite counter top
  • Dado Ceramic tiles above platform up to
    2 feet height
  • SinkStainless steel

Bathrooms

  • FlooringMatte finish ceramic tiles
  • DadoTiles till door height
  • WC, wash-basin and CPFittings of reputed brand
  • WaterProvision for hot and cold water

Electrical

  • ACElectrical wiring for split AC in
    master bedroom and living room
  • SwitchesModular switches of reputed make
  • Connection Provision for phone, TV and AC point
    in living,dinning & master bedroom
  • WiringConcealed copper wiring of
    reputed brand

Utility

  • Water Supply from bore well
  • LobbyVitrified tiles in the lobby
  • SecurityCCTV surveillance
  • UtilitySTP & rainwater harvesting
  • UtilityAviation light, 3rd generation
    lightning arrester & solar power
  • UtilityPainted façade
  • UtilityAdequate street lights for compound

Construction Status

As on 4th September, 2020

Landscape Garden
Lobby
Project Entrance

PRICING DETAILS